Ballard Locks - Things To Do In Ballard Seattle

The Hiram M. Chittenden Locks, or Ballard Locks, is a complex of locks at the west end of Salmon Bay, in Seattle, Washington's Lake Washington Ship Canal, between the neighborhoods of Ballard to the north and Magnolia to the south.

The Ballard Locks carry more boat traffic than any other lock in the US, and the Locks, along with the fish ladder and the surrounding Carl S. English, Jr., Botanical Gardens attract more than one million visitors annually, making it one of Seattle's top tourist attractions. The construction of the locks profoundly reshaped the topography of Seattle and the surrounding area, lowering the water level of Lake Washington and Lake Union by 8.8 feet (2.7 m), adding miles of new waterfront land, reversing the flow of rivers, and leaving piers in the eastern half of Salmon Bay high and dry. The Locks are listed on the National Register of Historic Places and the American Society of Civil Engineers Historic Civil Engineering Landmarks.




Prior to construction

As early as 1854, there was discussion of building a navigable connection between Lake Washington and Puget Sound for the purpose of transporting logs, milled lumber, and fishing vessels. Thirteen years later, the United States Navy endorsed a canal project, which included a plan for building a naval shipyard on Lake Washington. In 1891 the U.S. Army Corps of Engineers started planning the project. Some preliminary work was begun in 1906, and work began in earnest five years later under the command of Hiram M. Chittenden. The delays in canal planning and construction resulted in the US Navy building the Puget Sound Naval Shipyard in Bremerton, Washington, which is located across the Sound from Seattle.



Things To Do In Ballard, Seattle


Construction

In early 1909, the Washington State Legislature appropriated $250,000, placed under the control of the Corps of Engineers, for excavation of the canal between Lake Union and Lake Washington. In June 1910, the US Congress gave its approval for the lock, on the condition that the rest of the canals along the route be paid for locally. Construction was then delayed by legal challenges, mainly by mill owners in Ballard who feared property damage and loss of waterfront in Salmon Bay, and by Lake Washington property owners.

Under Major James. B. Cavanaugh, Chittenden's replacement as Seattle District Commander, construction of the Ballard, or Government, Locks connecting Salmon Bay to Shilshole Bay began in 1911, proceeding without further controversy or legal entanglements. In July 1912, the Locks gates were closed for the first time, turning Salmon Bay from saltwater to freshwater. The first ship passed through the Locks on August 3, 1916. On August 25, 1916, the temporary dam at Montlake was breached. During the following three months, Lake Washington drained, lowering the water level by 8.8 ft (2.7 m) and drying up more than 1,000 acres (400 ha) of wetlands, as well as drying up the Black River and cutting off the Cedar River salmon run. The Locks officially opened for boat traffic on May 8, 1917. The total cost of the project to that point was $3.5 million, with $2.5 million having come from the Federal government and the rest from local governments.

To allow for the intended boat traffic, three bridges were removed along the ship canal route, at Latona Avenue, Fremont, Stone Way. The Ballard and Fremont Bridges were completed in 1917, followed by the University Bridge in 1919, and Montlake Bridge in 1925. The University Bridge was improved in 1932, and in 1934 the Lake Washington Ship Canal project was declared complete.




Function

The locks and associated facilities serve three purposes:

  • To maintain the water level of the fresh water Lake Washington and Lake Union at 20â€"22 feet (6.1â€"6.7 m) above sea level, or more specifically, 20.6 ft (6.3 m) above Puget Sound's mean low tide.
  • To prevent the mixing of sea water from Puget Sound with the fresh water of the lakes (saltwater intrusion).
  • To move boats from the water level of the lakes to the water level of Puget Sound, and vice versa.

The complex includes two locks, 30 ft × 150 ft (9.1 m × 45.7 m) (small) and 80 ft × 825 ft (24 m × 251 m) (large). The complex also includes a 235 ft (72 m) spillway with six 32 ft × 12 ft (9.8 m × 3.7 m) gates to assist in water-level control. A fish ladder is integrated into the locks for migration of anadromous fish, notably salmon.

The grounds feature a visitors center, as well as the Carl S. English, Jr., Botanical Gardens.

Operated by the US Army Corps of Engineers, the locks were formally opened on July 4, 1917, although the first ship passed on August 3, 1916. They were named after US Army Major Hiram M. Chittenden, the Seattle District Engineer for the Corps of Engineers from April 1906 to September 1908. They were added to the National Register of Historic Places in 1978.

Vessels passing from the freshwater Lakes Washington and Union to Puget Sound enter the lock chamber through the open upper gates (A in the accompanying diagram). The lower gates (B) and the draining valve (D) are closed. The vessel is assisted by the lockwall attendants who assure it is tied down and ready for the chamber to be drained.

Next, the upper gates (A) and the filling valve (C) are closed and the draining valve (D) is opened allowing water to drain via gravity out to Puget Sound.

When the water pressure is equal on both sides of the gate, the lower gates (B) are opened, allowing the vessels to leave the lock chamber.

The process is reversed for upstream locking.




Locks

The complex includes two locks. Using the small lock when boat traffic is low conserves fresh water during summer, when the lakes receive less inflow. Having two locks also allows one of the locks to be drained for maintenance without blocking all boat traffic. The large lock is drained for approximately 2-weeks, usually in November, and the small lock is drained for about the same period, usually in March.

The locks can elevate a 760-by-80-foot (232 m × 24 m) vessel 26 ft (7.9 m), from the level of Puget Sound at a very low tide to the level of freshwater Salmon Bay, in 10â€"15 minutes. The locks handle both pleasure boats and commercial vessels, ranging from kayaks to fishing boats returning from the Bering Sea to cargo ships. Over 1 million tons of cargo, fuel, building materials, and seafood products pass through the locks each year.